Work is progressing on our house. As you see in the picture above, the new roof is on and the deck is ready for the boards to be planed and installed. By the end of this week we hope to be living there, even if primitively. The rain gutter is filling the lower barrel on the water tower, so we will be able to use the toilet and take baths. We have the water pump and pipes to run from a spring, which is down the hill, to the top tank of the water tower. There was a slight setback recently, as we discovered termites still living in the kitchen cabinets, so we tore them out. Fortunately, there was material left from the cabinets to almost make a complete door The current major work is to finish the water system, the deck, and installing doors and windows, but there are still more projects to come. Below is a list of items we still need to get set up.
Several times Chris has stopped work on the house to spend time fixing airplanes, and still there is only 1 out of 3 currently flying. So surely you can appreciate the urgency of getting the family settled in a stable home so that Chris can turn his focus to keeping the aviation program on its wings. We are praying that God will make our work efficient and remove all the obstacles we have been encountering.
If you would like to sponsor any items below, see the donation instructions at the end of this post, and send us an email telling us what your donation is to be used for.
Blessings from our God Above
Chris, Crystal, Corey and Cara |
|